Insights · Life situations and home types

Renovating: Before and During - When to Tell Your Insurer

A renovation is a double moment from an insurance point of view: your home's value goes up, and the risk during the works temporarily goes up too - but the policy doesn't find out about either on its own. Three points are worth a look: before major work, during it, and after it's finished. None of them take long, but all three matter at claim time.

In short:
  • After a value-adding renovation - bathroom, kitchen, roof, an extension - the sum insured needs raising, or the home quietly ends up underinsured.
  • Bigger work involving demolition or opening up structures is a change in risk: notify your insurer - a full rebuild is already the territory of construction-all-risks cover.
  • If the contractor causes damage, that's their responsibility: ask for proof of their contractor's liability insurance before you sign the contract.

After the renovation: let the sum match the value

A new kitchen, bathroom, roof or an extension raises the rebuilding value - if the sum insured stays at its old level, the gap can show up at claim time as a proportional settlement. The routine is simple: a short note to the insurer once the bigger job is finished, updating the sum and, if needed, the basic details. Keep the invoices and the technical documentation - a documented, up-to-date value is a strong argument at claim time - and an annual review turns this update into a regular habit. With an extension, the floor area changes too - not a minor point: without updating the basic details, the policy is still describing the old house.

During the works: notify, and use common sense

For smaller indoor jobs - painting, tiling - the existing policy and common sense are typically enough. Work involving demolition, opening up the roof or scaffolding, though, is already a material change in risk: notify your insurer, because some terms place restrictions on the period during the rebuild - especially if the flat is also unoccupied in the meantime. For a full rebuild or adding a storey, construction-all-risks cover is already the right product - that's the territory of our sister site, epites.biz (in Hungarian).

If the contractor causes damage

A good share of disputed renovation cases aren't natural-peril claims at all, but contractor error: a drilled-through pipe, a dropped bathtub, scratched flooring. That's primarily the contractor's responsibility - it's what contractor's liability insurance is for, and it's worth asking for proof of it before you even sign the contract. Your home insurance isn't cover for the contractor's mistakes; in borderline cases, though - say, water damage following a drilling job - it's also worth notifying your own insurer, via the claims line or online. Photograph the whole flat before work starts - a record of the starting condition is worth a lot in a dispute. It's also worth setting out the question of liability in the contractor agreement - for a properly run business, that's a natural request.

Solar panels and the like: the most common case

Solar panels, heat pumps and air conditioners share a common trait: significant value, sitting on the outside of the building, exposed to the weather. Cover for them varies by product - sometimes it's part of the buildings cover, sometimes it needs to be named separately, and the terms for hail, storm and power-surge damage differ too; our map of optional covers shows the details.

After installation, notification is the key step here too, with a copy of the invoice - that way the value is documented as well. The next step: run the numbers in minutes - or a short chat, even while the renovation is still just being planned.

A question about your own home? Run the numbers in minutes with the online calculator (in Hungarian), or book a free 20-minute consultation →

This article is for information purposes only; it contains general information and does not constitute an offer or insurance advice. The exact content of insurance contracts is defined by the insurers' terms and conditions in force.

Related articles

Let's talk it through in 20 minutes.

Free, with no obligation – by the end you will see your options and the next step clearly.

Book an appointment